Vague or Missing Scope of Work
The most dangerous red flag is an estimate that describes the work in broad, undefined terms. "Kitchen remodel — $28,000" tells you nothing. What's included? Which cabinets? What countertop material? Who handles demolition and disposal? What about plumbing and electrical rough-in? A professional estimate breaks the project into discrete tasks, each with materials, labor, and quantities specified. If the estimate reads like a napkin sketch, it was designed to give the contractor maximum flexibility and you minimum protection.
Every item that's not written down is a potential change order later. And change orders on a vague scope are almost impossible to dispute, because there's nothing to measure them against. Insist on a detailed, written scope before you agree to anything. If the contractor pushes back on providing detail, that itself is a red flag.
Missing Line Items
A complete estimate should itemize labor, materials, permits, disposal, and any allowances separately. When these are bundled into a single lump sum with no breakdown, you can't tell whether the pricing is fair, where the margin is, or what happens if you want to change one element. Lump-sum estimates also make it easy for the contractor to cut corners on materials without you noticing, because you never knew what materials were specified in the first place.
Ask for a line-item breakdown. If the contractor says "that's not how I do estimates," consider it a warning. Every reputable contractor can produce an itemized estimate — many use estimating software that generates them automatically.
Verbal-Only Agreements
If the contractor tells you the price and scope verbally but doesn't put it in writing, you have no contract. Verbal agreements are nearly unenforceable for home improvement work of any significant value, and they leave you with no documentation if a dispute arises. Everything — scope, price, timeline, payment terms, change-order process, warranty, permit responsibility — must be in writing and signed by both parties before work begins.
A contractor who resists putting things in writing is either disorganized (a risk in itself) or intentionally keeping things vague so they can redefine the terms later. Either way, don't proceed until you have a signed written agreement. This is foundational to every other protection in the verification process.
Lowball Bids
When one estimate is dramatically lower than the others, it's rarely because that contractor found efficiencies the others missed. Lowball bids typically indicate one of three things: the contractor is planning to make up the difference with change orders once the project starts; they're cutting corners on materials or labor; or they're underqualified and don't fully understand the scope. All three scenarios end badly for the homeowner.
Get at least three estimates for any significant project and compare them item by item, not just on total price. If one bid is 30% below the others, ask the contractor to explain the difference in detail. If they can't, that number is a trap, not a bargain. Confirm that each bidder has a valid license and insurance before comparing prices.
Pressure Tactics
"This price is only good today." "I have another customer ready to take this slot." "If you don't commit now, materials will go up." These are pressure tactics designed to bypass your due diligence. A legitimate contractor understands that homeowners need time to review estimates, check references, and verify credentials. They won't manufacture urgency because they don't need to — their reputation and work quality generate demand naturally.
If a contractor pressures you to sign before you've completed your research, that's a signal they don't want you to look too closely. Take your time. The right contractor will still be available tomorrow. If they're not, there are other qualified professionals who will be.
No Written Change-Order Process
Changes happen on almost every project. The question is whether those changes are documented, priced, and approved in writing before the work is done. An estimate that doesn't include a change-order process — or a contractor who says "we'll figure it out as we go" — is setting up a scenario where you'll be presented with surprise charges after the fact, with no leverage to negotiate.
A professional change-order process works like this: the contractor identifies the change, provides a written description and price, and the homeowner approves or declines in writing before any additional work begins. If the estimate doesn't address this, add it. Use the safe payment schedule guide to structure payments around approved milestones so change orders don't spiral out of control.
No Mention of Permits or Insurance
A professional estimate for work that requires permits will specify who is responsible for pulling them and include the permit costs. If permits aren't mentioned at all, either the contractor doesn't plan to pull them (which creates legal and safety risk for you) or they're hoping you won't ask. Similarly, the estimate or accompanying documentation should reference the contractor's insurance. If neither topic appears anywhere in the estimate, ask directly — and be wary of the answers.
If you've received an estimate that triggers multiple red flags from this list, document it and consider reporting it through our verification system. Patterns of predatory estimating practices are exactly the kind of risk that documentation-based accountability is designed to surface.
What a Good Estimate Looks Like
A trustworthy estimate includes: the contractor's full legal name, license number, and insurance reference; a detailed scope of work with materials and labor broken out; a clear timeline with milestones; a written change-order process; permit responsibilities stated explicitly; payment terms tied to milestones (not front-loaded); and warranty terms. Compare every estimate you receive against this standard. For a printable reference, visit the Trust Library.